Information updated: September 11, 2026
Twelve open, soon-to-be-launched, and region-specific measures for businesses, agriculture, and the public sector—along with financing solutions if the grant is not a good fit. Altmer Energy will assess your project’s eligibility and prepare the technical background information needed for the application.
For Businesses
3
For the Public Sector
3
Region-Based and Infrastructure
3
Financing Solutions
3
Grants and Funding Opportunities
Support measures are aimed at specific target groups, and the eligibility requirements change regularly. Select a category or browse all of them.
All (12)
Open (6)
Opening soon (0)
Region-based (2)
Infrastructure (1)
Funding (3)
SMEs involved in the processing of fishery and aquaculture products, as well as recognized producer organizations, may apply for grants to adopt renewable energy
Grant Amountup to 50%
Maximum subsidyup to €1,000,000
Acceptance of Applicationsuntil the budget is exhausted, no later than December 31, 2027
Read more
Support is available for the design, purchase, and installation of renewable energy generation equipment and energy storage systems.
Important: The maximum amount of support granted to an entrepreneur or producer organization may be less than €1,000,000, as the applicant’s equity and previous sales revenue are also taken into account when calculating the upper limit.
Recognized producer organizations and associations of producer organizations, cooperatives, and companies under their controlling influence that meet the requirements may apply for support.
Grant Amount15–50%
Maximum subsidyup to €2,500,000 per applicant
Acceptance of Applications18.06.–30.09.2026
Read more
Under this measure, investments may be made in the production of renewable energy for self-consumption. The renewable energy production capacity resulting from the project may not exceed the beneficiary’s annual self-consumption.
PRIA evaluates eligible applications based on the evaluation criteria. Whether a grant is awarded depends on the evaluation results and the budget for that round.
The grant is intended for local government units and public sector organizations under their control to carry out energy-efficient renovations of large existing buildings.
Grant Amount50–70% of eligible costs
Maximum subsidy€4,200,000–5,880,000 per project
Acceptance of ApplicationsMarch 30, 2026–January 4, 2027, 4:00 p.m.
Read more
The installation of solar panels and energy storage systems is eligible for support as part of a comprehensive building energy efficiency project. This is not a standalone subsidy for solar panels.
The building must meet the measure’s requirements regarding floor area, use, and energy efficiency, and energy consumption must be reduced as a result of the project.
The grant is intended to improve the energy efficiency of buildings used by the central government. Applicants may be legal entities under the controlling influence of the central government that own the buildings, or, in the case of state-owned buildings, the administrator of state property.
Round Budget27 000 000 €
Maximum subsidyup to 1,200 € per square meter
Acceptance of ApplicationsAugust 3–November 18, 2026, at 4:00 p.m.
Read more
Under this measure, eligible costs include, among other things, the costs of renewable energy generation equipment and its installation, as well as the costs associated with energy storage.
PV and energy storage must be part of a project aimed at improving a building’s energy efficiency. Applications that meet the requirements will be evaluated and ranked based on the evaluation criteria.
The grant is intended for local government units to enhance operational continuity at evacuation sites, emergency response centers, and daycare centers during a crisis.
Grant Amount100%
Maximum Amount of Supportup to €10,000 per recipient
Acceptance of Applicationsuntil December 31, 2026, or until the budget is exhausted
Read more
Support is provided for the purchase of a portable or stationary generator, the installation of an emergency power supply to connect the generator to the electrical system, and related construction, renovation, and design work. Support is also provided for the purchase of a portable battery station with a capacity of at least 4 kWh.
Important: This is not a subsidy for solar panels, but a measure for backup power and emergency preparedness.
The subsidy is intended for eligible companies engaged in the production of food and beverages and, in certain cases, for processors of agricultural products.
Grant Amount15–50%
Maximum subsidyup to €3,500,000 per applicant
Acceptance of Applications16.09.–30.09.2026
Read more
If a grant is requested for a building or piece of equipment needed to generate electricity from solar energy, the project must also include the purchase of a storage device.
The production and storage capacity established as a result of the project may not exceed the beneficiary’s annual self-consumption.
Businesses operating in fishing regions and other eligible applicants may be able to receive project grants for the implementation of renewable energy.
Maximum subsidyusually up to €400,000 during the program period
Allocation and Application Roundsdepend on the specific fishing region
Read more
Eligible costs may include the design, purchase, and installation of renewable energy generation equipment and energy storage systems.
The specific terms and conditions, the grant amount, and the application period must be verified with the action group for the relevant local fisheries area.
Businesses operating in the local action group’s region and other applicants who meet the program’s eligibility criteria may be eligible to receive LEADER project funding for investments, including the installation of solar panels and energy storage solutions necessary for the operation of a building.
Grant Amount for the Businessup to 60%
Maximum subsidyup to €200,000 per application
Application Deadlinesdepend on the local action group
Read more
The minimum grant rate is 15 percent. A local action group may reduce the grant rate and the maximum grant amount.
The PRIA’s 2026 LEADER e-PRIA guidelines list the purchase and installation of solar panels, as well as energy storage solutions necessary for the operation of a building, as examples of eligible construction activities. However, the eligibility of a specific project depends on the local action group’s strategy and the terms of the measure.
The grant is intended for distribution network operators providing network services in Ida-Viru County. The goal of the measure is to develop the electricity grid and infrastructure in order to create new opportunities for the development of business and industrial areas.
The highest level of support9 000 000 €
Budget for the measure€9,000,000 in total
Acceptance of ApplicationsApril 21–November 16, 2026, at 4:00 p.m.
Read more
Support is available for the construction of a distribution network in Ida-Viru County, the construction of infrastructure covered by the development plan, and the reconstruction of an existing connection point from the main grid to the boundary of the industrial area.
Important: This is not a direct subsidy for solar panels or energy storage systems intended for businesses. Only distribution system operators that meet the requirements are eligible to apply.
An LHV sustainable development loan can be used to finance, among other things, the construction of renewable energy generation and energy storage facilities, as well as improvements to a company’s energy efficiency.
Interest1.49% + 6-month Euribor
Loan Amountstarting at 25,000 €
Self-financingat least 30% of the loan amount
Read more
Under LHV’s terms and conditions, the down payment may be replaced with additional collateral. The final terms of the loan depend on the company’s financial indicators, collateral, and the bank’s credit decision.
Target audience: farmers, processors of agricultural products, the food industry, cooperatives, and rural businesses. The funding instrument supports investments in the production and processing of agricultural products, the food industry, cooperative activities, and rural entrepreneurship.
Base rate effective July 1, 20262.71% + individual margin
Read more
The individual margin depends on the company's credit rating and the collateral provided. The base rate is set as of the date the loan agreement is signed.
Important: The CAP SK funding instrument is a separate program and is not the same as the EMKVF funding instrument. The CAP SK is primarily aimed at investments in agriculture, the food industry, cooperative activities, and entrepreneurship in rural areas.
A loan from the CAP SK financing instrument cannot be used to pre-finance a grant. If the loan is used in conjunction with a grant, the MES conditions regarding financing and the cumulation of grants must be followed.
Intended for: producers of aquaculture products and processors of fishery and aquaculture products. A separate sector-specific financing solution for cases where a sustainable investment cannot secure sufficient funding from the market.
Loan Amountup to €1,000,000
Method of Financingjoint loan with a bank; the bank's share is at least 30%
Loan Termup to 7 years (≤€200,000), up to 15 years for larger loans
Read more
The investment loan for aquaculture producers is intended for investments in fixed assets related to sustainable aquaculture. The investment loan for processors is intended for micro, small, and medium-sized enterprises, as well as producer organizations, in the field of processing fish and aquaculture products.
Working capital related to the investment may constitute up to 30% of the total loan amount. The interest rate is determined in accordance with the European Commission’s methodology for reference and discount rates, taking into account the credit rating and collateral.
Important: The EMKVF funding instrument is not the same as the CAP SK funding instrument. The EMKVF is specifically aimed at the fisheries and aquaculture sectors.
A loan from the EMKVF financing instrument may not be used to pre-finance a grant, and a grant may not be used to repay the loan.
The subsidy is intended for eligible companies engaged in the production of food and beverages and, in certain cases, for processors of agricultural products.
Grant Amount15–50%
Maximum subsidyup to €3,500,000 per applicant
Acceptance of Applications16.09.–30.09.2026
Read more
If a grant is requested for a building or piece of equipment needed to generate electricity from solar energy, the project must also include the purchase of a storage device.
The production and storage capacity established as a result of the project may not exceed the beneficiary’s annual self-consumption.
SMEs involved in the processing of fishery and aquaculture products, as well as recognized producer organizations, may apply for grants to adopt renewable energy
Grant Amountup to 50%
Maximum subsidyup to €1,000,000
Acceptance of Applicationsuntil the budget is exhausted, no later than December 31, 2027
Read more
Support is available for the design, purchase, and installation of renewable energy generation equipment and energy storage systems.
Important: The maximum amount of support granted to an entrepreneur or producer organization may be less than €1,000,000, as the applicant’s equity and previous sales revenue are also taken into account when calculating the upper limit.
Recognized producer organizations and associations of producer organizations, cooperatives, and companies under their controlling influence that meet the requirements may apply for support.
Grant Amount15–50%
Maximum subsidyup to €2,500,000 per applicant
Acceptance of Applications18.06.–30.09.2026
Read more
Under this measure, investments may be made in the production of renewable energy for self-consumption. The renewable energy production capacity resulting from the project may not exceed the beneficiary’s annual self-consumption.
PRIA evaluates eligible applications based on the evaluation criteria. Whether a grant is awarded depends on the evaluation results and the budget for the round.
The grant is intended for local government units and public sector organizations under their control to carry out energy-efficient renovations of large existing buildings.
Grant Amount50–70% of eligible costs
Maximum subsidy€4,200,000–5,880,000 per project
Acceptance of ApplicationsMarch 30, 2026–January 4, 2027, 4:00 p.m.
Read more
The installation of solar panels and energy storage systems is eligible for support as part of a comprehensive building energy efficiency project. This is not a standalone subsidy for solar panels.
The building must meet the measure’s requirements regarding floor area, use, and energy efficiency, and energy consumption must be reduced as a result of the project.
The grant is intended to improve the energy efficiency of buildings used by the central government. Applicants may be legal entities under the controlling influence of the central government that own the buildings, or, in the case of state-owned buildings, the administrator of state property.
Round Budget27 000 000 €
Maximum subsidyup to 1,200 € per square meter
Acceptance of ApplicationsAugust 3–November 18, 2026, at 4:00 p.m.
Read more
Under this measure, eligible costs include, among other things, the costs of renewable energy generation equipment and its installation, as well as the costs associated with energy storage.
PV and energy storage must be part of a project aimed at improving a building’s energy efficiency. Applications that meet the requirements will be evaluated and ranked based on the evaluation criteria.
The grant is intended for local government units to enhance operational continuity at evacuation sites, emergency response centers, and daycare centers during a crisis.
Grant Amount100%
Maximum Amount of Supportup to €10,000 per recipient
Acceptance of Applicationsuntil December 31, 2026, or until the budget is exhausted
Read more
Support is provided for the purchase of a portable or stationary generator, the installation of an emergency power supply to connect the generator to the electrical system, and related construction, renovation, and design work. Support is also provided for the purchase of a portable battery station with a capacity of at least 4 kWh.
Important: This is not a subsidy for solar panels, but a measure for backup power and emergency preparedness.
Businesses operating in fishing regions and other eligible applicants may be able to receive project grants for the adoption of renewable energy.
Maximum subsidyusually up to €400,000 during the program period
Allocation and Application Roundsdepend on the specific fishing region
Read more
Eligible costs may include the design, purchase, and installation of renewable energy generation equipment and energy storage systems.
The specific terms and conditions, the grant amount, and the application period must be verified with the action group for the relevant local fisheries area.
Businesses operating in the local action group’s region and other applicants who meet the program’s eligibility criteria may be eligible to receive LEADER project funding for investments, including the installation of solar panels and energy storage solutions necessary for the operation of a building.
Grant Amount for the Businessup to 60%
Maximum subsidyup to €200,000 per application
Application Deadlinesdepend on the local action group
Read more
Minimaalne toetuse määr on 15%. Kohalik tegevusrühm võib toetuse määra ja maksimaalset toetussummat vähendada.The minimum grant rate is 15 percent. A local action group may reduce the grant rate and the maximum grant amount.
The PRIA’s 2026 LEADER e-PRIA guidelines list the purchase and installation of solar panels, as well as energy storage solutions necessary for the operation of a building, as examples of eligible construction activities. However, the eligibility of a specific project depends on the local action group’s strategy and the terms of the measure.PRIA 2026. aasta LEADERi e-PRIA juhendis on toetatavate ehitustegevuste näidetena toodud päikesepaneelide ostmine ja paigaldamine ning ehitise toimimiseks vajalikud energiasalvestuslahendused. Konkreetse projekti abikõlblikkus sõltub siiski kohaliku tegevusrühma strateegiast ja meetme tingimustest.
The grant is intended for distribution network operators providing network services in Ida-Viru County. The goal of the measure is to develop the electricity grid and infrastructure in order to create new opportunities for the development of business and industrial areas.
The highest level of support9 000 000 €
Budget for the measure€9,000,000 in total
Acceptance of ApplicationsApril 21–November 16, 2026, at 4:00 p.m.
Read more
Support is available for the construction of a distribution network in Ida-Viru County, the construction of infrastructure covered by the development plan, and the reconstruction of an existing connection point from the main grid to the boundary of the industrial area.
Important: This is not a direct subsidy for solar panels or energy storage systems intended for businesses. Only distribution system operators that meet the requirements are eligible to apply.
An LHV sustainable development loan can be used to finance, among other things, the construction of renewable energy generation and energy storage facilities, as well as improvements to a company’s energy efficiency.
Interest1.49% + 6-month Euribor
Loan Amountstarting at 25,000 €
Self-financingat least 30% of the loan amount
Read more
Under LHV’s terms and conditions, the down payment may be replaced with additional collateral. The final terms of the loan depend on the company’s financial indicators, collateral, and the bank’s credit decision.
Target audience: farmers, processors of agricultural products, the food industry, cooperatives, and rural businesses. The funding instrument supports investments in the production and processing of agricultural products, the food industry, cooperative activities, and rural entrepreneurship.
Base rate effective July 1, 20262.71% + individual margin
Read more
The individual margin depends on the company's credit rating and the collateral provided. The base rate is set as of the date the loan agreement is signed.
Important: The CAP SK funding instrument is a separate program and is not the same as the EMKVF funding instrument. The CAP SK is primarily aimed at investments in agriculture, the food industry, cooperative activities, and entrepreneurship in rural areas.
A loan from the CAP SK financing instrument cannot be used to pre-finance a grant. If the loan is used in conjunction with a grant, the MES conditions regarding financing and the cumulation of grants must be followed.
Intended for: producers of aquaculture products and processors of fishery and aquaculture products. A separate sector-specific financing solution for cases where a sustainable investment cannot secure sufficient funding from the market.
Loan Amountup to €1,000,000
Method of FinancingJoint loan with a bank; the bank's share is at least 30%
Loan Termup to 7 years (≤€200,000), up to 15 years for larger loans
Read more
The investment loan for aquaculture producers is intended for investments in fixed assets related to sustainable aquaculture. The investment loan for processors is intended for micro, small, and medium-sized enterprises, as well as producer organizations, in the field of processing fish and aquaculture products.
Working capital related to the investment may constitute up to 30% of the total loan amount. The interest rate is determined in accordance with the European Commission’s methodology for reference and discount rates, taking into account the credit rating and collateral.
Important: The EMKVF funding instrument is not the same as the CAP SK funding instrument. The EMKVF is specifically aimed at the fisheries and aquaculture sectors.
A loan from the EMKVF financing instrument may not be used to pre-finance a grant, and a grant may not be used to repay the loan.
Altmer Energy by the Numbers
Total capacity of completed solar power plants.
Total capacity of installed energy storage systems.
The total capacity of the planned energy storage systems.
Find out if your project is eligible for funding
Please send us a brief description of the property and its usage—we will let you know which measures are realistic for you and what the application requires.
assess the project's initial suitability
Develop a technical solution for a solar power plant and energy storage system
prepare a price quote and technical specifications
prepare the documentation required for the application
Important: The terms and conditions, budgets, and application deadlines for support measures are subject to change. Before making an investment or beginning work, you should always check the current official terms and conditions for the specific measure.
Fact-checking: Official sources from PRIA, RTK, EIS, LHV, and MES. Verified on August 21, 2026.
Jätke meile oma ettevõtte ja projekti põhiandmed. Vaatame info üle ning võtame teiega ühendust, et arutada sobivaid toetus- ja energialahenduse võimalusi.